Step 1: the baseline
Before switching anything on, measure the current workflow for two to four weeks: volume, time per task, error rate, and any customer measure affected (response time, satisfaction).
Step 2: all the costs
- Tool subscriptions and usage charges.
- Set-up and integration work.
- Staff time for training and reviewing outputs.
- Ongoing oversight and maintenance.
Step 3: the benefits
| Benefit | How to measure |
|---|---|
| Time saved | (Old time − new time) × volume × hourly cost |
| Quality | Error rate, rework, complaints |
| Speed | Response or turnaround time |
| Revenue effects | Conversion or retention changes you can reasonably attribute |
Step 4: decide with pre-agreed rules
Write down before the pilot: “We’ll scale if we save at least X hours a month with no drop in quality. We’ll stop if errors rise above Y.” This prevents pilots that never end.
From our work: [An AI pilot PURSHO measured: baseline, costs, results and the scale-or-stop decision]
Common mistakes
- Counting time saved that isn’t used for anything valuable.
- Ignoring the time people spend checking outputs.
- Measuring only the first week, when novelty inflates results.
We design pilots and measures in our AI and automation consulting.